Hot search:
 

Stadium Building Steel Structure

Click on the image to check the artwork
unit price: negotiable
min amount:
amount:
period for delivery: Consignment Deadline Days
area: Zhejiang
Expiry date : Long Effective
last update: 2018-06-14 15:55
view count: 308
enquiry
Company Profile
 
 
Product details

Stadium Building Steel Structure


Advantages

(1)  Single-layer span is large; it can also be constructed into multi-layer steel structure.

(2) Simple construction; short construction period: all components are prefabricated in the factory, and the site is simply assembled, which greatly shortens the construction period. A 6000 square meter building can be basically installed in 40 days.

(3) Durable; the steel structure gymnasium is easy to maintain, and the steel structure designed by the general computer can resist the bad weather and requires simple maintenance.

(4) Beautiful and practical; steel structure building lines are simple and smooth, with a modern feel. The color wall panels are available in a variety of colors, and the walls are available in other materials for greater flexibility.

(5) Reasonable cost: the steel structure gymnasium is light in weight, reducing the basic cost, reducing the cost of traditional concrete buildings by more than half, and the construction speed is fast, and the comprehensive economic benefits are much better than the concrete structure buildings.

(6) High strength, large strength to weight ratio; good plasticity and toughness;

(7) Green and environmental protection, no dust, gas, recycling and reuse

(8) Uniform material, in line with mechanical assumptions, high safety and reliability;

(9) Fast construction speed;

The sports center Jiangyin Stadium Building Steel Structure is located in jiangyin city east new district, and jiangyin Yangtze river bridge. It has a total construction area of 85470 square meters. Among them, the construction area of 41200 square meters. The plane is oval, five floors on the ground, eaves, 47.8 meters high, frame shear wall structure; Underground garage and commercial facilities, the plane is right triangle on the whole, 280.5 meters long, 158 meters long from north and south, frame structure, the underground layer 1, layer 2, on the ground, for steel cable membrane structure and business facilities at the top of the stadium.  


http://www.huawusteel.com/

Total0bar [View All]  Related Comments
 
More>other products

[ ProductsSearch ]  [ Send Fav ]  [ Share ]  [ Print ]  [ Send Report ]  [ Close ]

 
Home | Products | Suppliers | News | Tradeshow | Sitemap | Message | RSS Feed